IMPROVE BUILDING OPERATIONS 
WITHOUT SIGNIFICANT CAPITAL INVESTMENT IN NEW EQUIPMENT
                            WITHOUT SIGNIFICANT CAPITAL INVESTMENT IN NEW EQUIPMENT
                                The same systematic process applied to existing buildings that have never been commissioned to ensure that their systems can be operated and maintained according to the owner’s needs.
Retro/recommissioning allows an owner to understand how closely the building comes to operating as intended. It identifies improper equipment performance, what equipment or systems need to be replaced, opportunities for saving energy and money, and strategies for improving performance of the various building systems.
GET IN TOUCH ->
                        Retro/recommissioning allows an owner to understand how closely the building comes to operating as intended. It identifies improper equipment performance, what equipment or systems need to be replaced, opportunities for saving energy and money, and strategies for improving performance of the various building systems.
RETRO/RECOMMISSIONING CANDIDATES:
                            - A low ENERGY STAR performance rating or a high energy use index that cannot be explained, or unexplained increases in energy consumption.
- Persistent failure of building equipment, control systems, or both.
- Excessive occupant complaints about temperature, airflow, and comfort.
GET IN TOUCH ->
RELATED PROJECT
                             
                                        
                                            QUINTE COURTHOUSE 
                                        
                                    
                                        The Quinte Courthouse civic infrastructure project accommodates the newly consolidated operations of the Ontario Court of Justice and Superior Court of Justice in Hastings County. The Courthouse is comprised of 11 courtrooms, public spaces, large courtrooms, ceremonial spaces, and jury selection rooms. Areas with higher levels of security spaces are placed near the top of the six-storey building, while less used spaces are located on the ground floor. Featuring exceptional views of Lake Ontario and an impressive selection of materials. 
                                        
Location: Belleville, Ontario
Size/Area: 160,000 SqFt
Completed: 2022
                                Location: Belleville, Ontario
Size/Area: 160,000 SqFt
Completed: 2022
SEE MORE ->















 
        